Client: |
|
University of Adelaide |
Main Contractor: |
|
Hindmarsh Pty Ltd |
Foundation Contractor: |
|
BAUER Foundations Australia Pty Ltd |
Scope of work: |
|
93 CFA piles, diameter 880mm, depth to 23m |
Construction Period: |
|
January 2008 – March 2008 |
Construction of a new Engineering Building for the University of Adelaide commenced in 2007 with the demolition of an existing faculty building. The new $100m engineering building has eight stories and a below ground basement.
The basement foundation works included a 56m x 28m excavation to a depth of 6m. The construction of the retaining wall for the excavation and the foundation piles was assigned to the Piling Contractors Bauer Australia Joint Venture.